HomePricingEICR SoftwareElectrical Certificate SoftwareElectrical Testing SoftwareElectrical Contractor SoftwareEICR Certificate SoftwareBest EICR SoftwareFree EICR SoftwareElectrical Certificate AppElectrical Certificate Software PricingFree Tools2391-52 Mock ExamMax Zs CalculatorCable CalculatorPFC CalculatorCode BreakerRing CalculatorMax Demand CalculatorBlogPressPrivacyTermsAll Pages
TestFast Logo - Professional Electrical Testing SoftwareTestFast
FeaturesHow It WorksWhy Us?PricingFAQFree Tools
LoginGet Started
Back to Blog
Share:
2 July 20261 min read

EICR Qualification Changes October 2026

Everything UK electricians and landlords need to know about October 2026

Michael Adrian

Written by

Michael Adrian

EICR Qualification Changes October 2026

Current as of 2 July 2026. The EAS Qualifications Guide is updated periodically - always check the latest version on the IET EAS page for any changes.


Three regulatory events converge on October 2026, and if you carry out EICRs or rent property in the UK, you need to understand all three.

First, the Electrotechnical Assessment Specification (EAS) requires every individual electrician carrying out EICRs to hold a specific Level 3 qualification from 1 October 2026. The old model where one Qualified Supervisor could cover a whole firm is ending.

Second, the EICR renewal cliff is here. The first wave of mandatory EICRs from 2021 is expiring now, and social housing EICRs became mandatory in May 2026.

Third, BS 7671 Amendment 4 (the "Orange Book") takes full effect on 15 October 2026 - 14 days after the EAS deadline - bringing a new EICR form layout and updated standards.

Who this is for: Electricians are the primary audience - if you carry out EICRs under a Competent Person Scheme, this affects your livelihood. Landlords are the secondary audience - the qualification change affects who can legally issue your EICR and what it costs. Each section is signposted so you can find what matters to you.


What Is the EAS and Why Has It Changed?

The Electrotechnical Assessment Specification (EAS) is an industry-agreed specification, not a statute. It was developed by a management committee including the IET, NICEIC, NAPIT, ECA, SELECT, Electrical Safety First, the Building Safety Regulator, UKAS, TESP, and the Welsh Government. The current version (EAS October 2024, reference EAS 24-527B) replaces the October 2021 edition. Read the full specification on the IET EAS page.

The Grenfell origin

The EAS update traces directly to the Grenfell Tower fire in 2017, which claimed 72 lives. Dame Judith Hackitt's review found a lack of consistency in competence standards across the built environment. As the NICEIC's official EAS guidance states: the review "highlighted a lack of consistency in competence standards across the built environment industry." The EAS update is the electrotechnical industry's response.

Industry specification, not law - but the practical effect is regulatory

The EAS is not a statute. Non-compliance does not carry a criminal penalty. But if you cannot meet the EAS requirements, your certification body can remove specific work categories from your registration scope. Persistent non-compliance can result in complete withdrawal of your Competent Person Scheme registration. Without scheme registration, EICRs you issue will not be recognised by landlords, letting agents, or local authorities.

The shift from firm-level to individual competence

Previously, a firm could rely on one Qualified Supervisor (QS) with the right qualifications to cover multiple operatives. Those operatives could perform EICRs based on experience alone, as long as the QS oversaw the work.

From 1 October 2026, every individual carrying out periodic inspection and testing must hold the required qualification, have 2 years of documented experience, and show evidence of ongoing CPD.


What Qualifications Are Now Required for EICRs?

This section is for electricians. If you're a landlord, jump to What Landlords Should Know and Check.

The specific requirement

From 1 October 2026, every employed person carrying out periodic inspection and testing must hold:

  1. A Level 3 Award in the Periodic Inspection and Testing of Electrical Installations (City & Guilds 2391-51), OR
  2. A Level 3 Award covering both Initial Verification and Periodic Inspection (City & Guilds 2391-52), OR
  3. An equivalent qualification listed in the EAS Qualifications Guide

Plus:

  • 2 years of documented experience in periodic inspection and testing
  • Evidence of ongoing CPD

Both NICEIC and NAPIT confirm these requirements in identical terms.

The critical distinction: Level 3 Award is not Level 3 Diploma

Several competitor articles get this wrong, so let's be clear:

  • City & Guilds 2391-51 / 2391-52 - These are Level 3 Awards in inspection and testing. They are specific, focused qualifications that test your ability to inspect and test electrical installations. This is what the EAS requires.
  • City & Guilds 2365 - This is a Level 3 Diploma in Electrical Installation. It is a core trade qualification that covers the fundamentals of electrical installation. It is not the inspection and testing qualification required by the EAS.

The 2365 is a foundation. The 2391 builds on it. You need the 2391 (or equivalent) on top of your core trade qualification to carry out EICRs under a Competent Person Scheme from October 2026.

Equivalent qualifications - you may already be compliant

The 2391-52 is the most commonly cited qualification, but it is not the only one. The EAS Qualifications Guide lists equivalents including:

  • C&G 2391-04 (the older 2391)
  • C&G 2394 / 2395 (previous inspection and testing qualifications before consolidation into 2391-51/52)
  • Other qualifications listed in the EAS Qualifications Guide

If you hold a legacy qualification, check the definitive lists before booking a new course: NICEIC Acceptable Qualifications PDF | NAPIT Qualifications Guide PDF. The ECA also provides guidance on competence requirements.

Route 3: Experienced Worker Assessment

For electricians with extensive experience but no formal qualification, the Experienced Worker Assessment (Route 3 / RPEL) assesses existing competence through practical assessment rather than a full course. Check with your scheme provider for specific Route 3 requirements.

Trainees and apprentices

Both NICEIC and NAPIT confirm that trainees and apprentices can continue undertaking periodic inspection and testing under appropriate supervision. The requirement applies to individuals carrying out EICRs independently.

Required qualifications at a glance

RequirementWhat countsWhat doesn't countHow to verify
Level 3 Award in Inspection & TestingC&G 2391-51, 2391-52, 2391-04, 2394/2395, or equivalent in EAS Qualifications GuideLevel 3 Diploma (2365) alone, 18th Edition alone, manufacturer trainingCheck NICEIC Acceptable Qualifications PDF or NAPIT Qualifications Guide
2 years documented experienceEICR records you've signed, assessment reports, employer lettersUndocumented experience, self-declaration without evidenceGather EICR certificates and assessment records
Ongoing CPDTraining records, seminar attendance, online CPD logsNone - CPD is an ongoing requirementMaintain a CPD log with dates and content

The Implementation Timeline

DateEventSource
October 2024EAS October 2024 published, replacing October 2021 versionIET
Oct 2024 – Oct 2025Awareness phase: assessors flag qualification gaps at visitsNICEIC
November 2025Social housing EICR requirements begin (new tenancies)gov.uk
January 2025NICEIC reportedly begins notifying members that 2391 is requiredElectricians Forums (field insight - see below)
9 March 2026NICEIC updates acceptable qualifications list (adds C&G 2919-01, 2919-02)NICEIC
April 2026BS 7671 Amendment 4 published ("Orange Book")IET shop
May 2026Social housing existing tenancies must have EICRsgov.uk
1 October 2026EAS hard deadline - individual qualification mandatoryNICEIC, NAPIT
15 October 2026BS 7671 previous edition withdrawn; Amendment 4 mandatoryIET

Phased enforcement

The EAS implementation has been phased:

  • Awareness phase (Oct 2024 – Oct 2025): Assessors flagged qualification gaps during visits but did not enforce. Businesses were expected to start planning.
  • Improvement phase (Oct 2025 – Oct 2026): Assessors work with businesses to agree action plans. Non-conformance notices may be issued.
  • Hard deadline (1 October 2026): Full enforcement begins. Non-compliance risks scope removal.

NICEIC retrospectivity - a field insight

In a January 2025 Electricians Forums thread, a 15-year NICEIC Approved Contractor reported being told in November 2024 that the new rules would not be retrospective, only for NICEIC to change position in January 2025 and require 2391 as compulsory. This is a single forum user's account, not confirmed as official NICEIC policy. We have labelled it as a field insight because NICEIC has not published a formal position statement on retrospectivity. Treat it as a reported experience, not confirmed policy - and check with your scheme provider if unsure.


The Three-Way Convergence - Why October 2026 Is Unique

This is the story no one else is telling. Three regulatory events converge on the same fortnight in October 2026. The EAS governs who can do EICRs. BS 7671 governs how EICRs are done. Both hit in the same fortnight, alongside a surge in demand for renewals.

1. EAS qualification deadline - 1 October 2026

The pool of electricians who can legally carry out EICRs under a Competent Person Scheme shrinks on 1 October 2026. Every individual must hold the Level 3 Award in inspection and testing, have 2 years of documented experience, and show CPD evidence. Electricians who have been doing EICRs for decades on experience alone will need to either get qualified or stop carrying out EICRs under scheme certification.

2. EICR renewal cliff - happening now

The Electrical Safety Standards in the Private Rented Sector (England) Regulations 2020 required every landlord in England to have a satisfactory EICR in place for existing tenancies by 1 April 2021. Those 5-year certificates are expiring now. Property118 has called this "the EICR time bomb."

The private rented sector covers approximately 4.7 million households in England. On top of that, social housing EICRs became mandatory for existing tenancies in May 2026 - adding roughly 4 million social housing properties to the demand.

3. BS 7671 Amendment 4 - 15 October 2026

BS 7671:2018+A4:2026 (the "Orange Book") was published on 15 April 2026. The previous edition runs in parallel until 15 October 2026, when it is withdrawn and Amendment 4 becomes mandatory.

The key changes for EICR practitioners include:

  • EICR form changes: The model forms in Appendix 6 have been updated to separate C1 and C2 observations from C3 and FI codes on the report. For a full explanation of what each code means, see our EICR observation codes explained guide.
  • Chapter 57: A new chapter covering stationary secondary batteries and battery energy storage systems - the most substantial new addition in Amendment 4.
  • Updated standards: Changes to maximum Zs values and other technical references. Use our maximum Zs values calculator to check against the latest amendment.

You can purchase Amendment 4 from the IET shop.

The capacity squeeze

  • Fewer qualified electricians: Industry observers estimate there are around 25% fewer working electricians than in 2021, according to Fieldmotion. This is an industry estimate, not a government statistic.
  • More properties needing EICRs: 4.7 million PRS households plus 4 million social housing properties, with the 2021 renewal wave hitting simultaneously.
  • Each EICR takes longer: The new A4 form layout and updated standards mean inspectors need to adjust their process.

The result is a bottleneck. More demand, fewer qualified inspectors, each inspection taking longer. EICR prices are already rising.

The practical overlap

An electrician carrying out an EICR on 2 October 2026 must be individually qualified under the EAS, use the new BS 7671 Amendment 4 EICR form, and apply A4 coding standards - all simultaneously. If you're managing EICR renewals across multiple properties or clients, TestFast's EICR software helps you track renewal dates and stay ahead of the cliff.


What Electricians Should Do Now - Step-by-Step Checklist

This is the practical part. If you carry out EICRs under a Competent Person Scheme, here is your action plan.

Step 1: Check your current qualifications

Download the NICEIC Acceptable Qualifications PDF or the NAPIT Qualifications Guide and check whether your existing qualifications are listed. If you hold 2391-04, 2394, 2395, or another legacy qualification, you may already be compliant. Do not assume you need a new course until you've checked the list.

Step 2: Verify your scheme grade requirements

Different scheme grades may have different qualification tables. NICEIC Domestic Installer and NICEIC Approved Contractor have different requirements. Check your specific scheme grade against the relevant qualification table, not just the general EAS guidance.

Step 3: Book the 2391-51 or 2391-52 if you need it

If you do need the qualification, book now. Training providers are warning of course bottlenecks. An engineer starting in August 2026 may not certify before October. Typical course costs range from £500 to £1,500 depending on provider and location. One electrician reported paying £4,400 including travel and exam fees - a reported high-end case, not typical, but it illustrates the potential total investment for sole traders in remote areas.

Step 4: Gather your evidence

You need 2 years of documented experience in periodic inspection and testing. Gather EICR certificates you've signed, assessment reports from scheme visits, employer letters, and any other documentation proving your experience.

Step 5: Start or update your CPD log

Ongoing CPD is now a requirement. Start a CPD log if you don't have one - record dates, content, and providers for any training, seminars, or technical updates you've completed. TestFast helps you track your EICRs, store qualification evidence, and log CPD records in one place - so you're ready for your next assessment.

Step 6: Check your scheme's specific guidance

Read your scheme's EAS page directly: NICEIC or NAPIT. Your scheme provider's guidance is authoritative for your specific situation - do not rely on third-party summaries alone.

Step 7: Audit every employed person

The EAS defines "employed person" broadly: PAYE staff, temporary or agency workers, subcontracted labour, self-employed individuals, sole traders, and CIS-registered labour. Every individual carrying out EICRs under your firm's registration must meet the requirements. Audit everyone now.

Step 8: Prepare for BS 7671 Amendment 4

Get the Orange Book. Learn the new EICR form layout (C1/C2 separated from C3/FI). Review Chapter 57 if you work with battery storage. The previous edition is withdrawn on 15 October 2026.


What Landlords Should Know and Check

This section is for landlords and letting agents. The qualification change is not a landlord law, but it directly affects who can issue your EICR.

The qualification change is not a landlord law - but it affects your compliance

Your legal obligation to have an EICR comes from the Electrical Safety Standards in the Private Rented Sector (England) Regulations 2020 - a statute with fines for non-compliance. The EAS qualification requirement is an industry specification governing who can join a Competent Person Scheme. These are different mechanisms, but they interact: the law requires you to use a "qualified" person, and the EAS defines what "qualified" means for scheme members. If your electrician loses their scheme registration after 1 October 2026, their EICRs will not be accepted as evidence of compliance.

How to verify your electrician is qualified

  1. Check scheme membership: Confirm your electrician is registered with NICEIC, NAPIT, ECA, or SELECT.
  2. Ask about their qualification: They should hold C&G 2391-51, 2391-52, or an equivalent listed in the EAS Qualifications Guide.
  3. Confirm 2 years of experience: The EAS requires 2 years of documented periodic inspection and testing experience.
  4. Don't assume "Level 3" means qualified: The 2365 Diploma is a core trade qualification, not the inspection and testing qualification. Ask specifically about 2391 or equivalent.

Check your EICR expiry dates now

The first wave of mandatory EICRs from 2021 is expiring. Check the expiry date on your current EICR certificate and book the renewal before the deadline. With the qualified pool shrinking and demand surging, lead times are extending.

The 28-day remedial window

If your EICR contains C1 or C2 codes, you must complete remedial work within 28 days. Local authorities can impose fines for non-compliance.

Fines increased to £40,000

From November 2025, the maximum civil penalty for breaching EICR regulations increased from £30,000 to £40,000. The NRLA and Property118 both confirm this increase.

The Renters' Rights Act complication

Under the Renters' Rights Act, Section 21 "no-fault" evictions are being abolished. If a tenant refuses access for an EICR inspection, you cannot use a Section 21 notice as leverage. However, the regulations provide a legal defence: if you can demonstrate you took "all reasonable steps" to arrange the inspection, you have a defence against prosecution. Document every access attempt.

Budget for higher costs and longer lead times

EICR prices are rising. Increased demand, a shrinking qualified pool, and more complex inspections under Amendment 4 make higher costs inevitable. Book early. Landlord communities on Property118 are already reporting scheduling difficulties in some regions.

Official government guidance

For the authoritative source on landlord obligations, read the gov.uk electrical safety standards guidance.


Other Affected Work Categories

The same EAS model - individual Level 3 qualification, 2 years experience, CPD - applies to several other work categories from 1 October 2026:

  • EV charging: C&G 2919-01, 2919-02, or equivalent (added to NICEIC list 9 March 2026)
  • Solar PV: Level 3 in Small-Scale Solar PV Systems or equivalent
  • Electrical Energy Storage Systems (EESS): relevant Level 3 qualification
  • Micro wind turbines: relevant Level 3 qualification

Manufacturer training alone is not sufficient. There are no grandfather rights for low-carbon work. Check the EAS Qualifications Guide for full requirements.


The Enforcement Reality - What Happens After 1 October 2026

Phased enforcement, not instant penalties

Enforcement is not a cliff edge. Assessors are working with businesses now to agree action plans. But after 1 October 2026:

  1. Non-compliance: Specific work categories (e.g., A2.1/A2.2 for periodic inspection) can be removed from your registration scope.
  2. Persistent non-compliance: Complete withdrawal of Competent Person Scheme registration.
  3. No formal grace period has been announced.

This is not a criminal penalty

The EAS is an industry specification. Non-compliance does not result in prosecution. But without scheme registration, EICRs from your business will not be recognised by landlords, agents, local authorities, or insurers.

Insurance implications

Some insurers now require proof of specific competence for inspection and testing. Check your policies - you may need to demonstrate EAS compliance to maintain coverage.

Switching schemes is not a workaround

The EAS applies to all certification bodies. NICEIC states: "These changes are not specific to NICEIC. The EAS is intended for use by all electrotechnical certification bodies." NAPIT confirms the same. Switching schemes does not change the requirement.


Common Questions and Confusions

"I've been doing EICRs for 15 years without 2391 - do I really need it now?"

Yes, from 1 October 2026. Your experience is real and valuable, and the EAS recognises it through the 2-year experience requirement. But the formal qualification is now mandatory for scheme membership. If you have extensive experience but no formal qualification, look at Route 3 (Experienced Worker Assessment) as a potential pathway rather than starting a full course from scratch.

"Will the rules be retrospective?"

The EAS applies to all scheme members from 1 October 2026, regardless of when they joined. In a January 2025 Electricians Forums thread, a 15-year NICEIC member reported being told in November 2024 that the rules would not be retrospective, then being told in January 2025 that 2391 was compulsory. This is a single forum user's account and has not been confirmed as official NICEIC policy. It is labelled here as a field insight. If you're in this position, contact your scheme provider directly for clarity.

"Can I move to NAPIT or SELECT to avoid the requirement?"

No. The EAS applies to all certification bodies. NICEIC, NAPIT, SELECT, ECA - they all align to the same EAS standard. Switching schemes does not change the requirement. This misconception circulates in forum threads, but it is not a real workaround.

"What counts as 'equivalent' to 2391-52?"

Check the NICEIC Acceptable Qualifications PDF and the NAPIT Qualifications Guide. Legacy qualifications including 2391-04, 2394, and 2395 may already count. Do not book a new course until you've checked whether your existing qualifications are accepted.

"Does my Level 3 Diploma (2365) count?"

No, not by itself. The 2365 is a core trade qualification. The EAS requires a specific inspection and testing qualification - the 2391-51 or 2391-52 (or equivalent). These are separate, focused qualifications that sit on top of your core trade qualification. Several online articles list the 2365 as a required EICR qualification - this is incorrect. The 2365 is a foundation, not the inspection and testing qualification.

"Is there a grace period after October 2026?"

No formal grace period has been announced. Assessors are working with businesses on action plans during the improvement phase (up to October 2026), but after the deadline, non-compliance risks having work categories removed from your registration scope. Do not assume there will be extra time.

"I hold 2391-52 but NICEIC is asking for more - why?"

Forum reports indicate that even with 2391-52, some electricians are being asked for additional qualifications depending on their scheme grade. NICEIC Domestic Installer and NICEIC Approved Contractor have different qualification tables. This is a field insight from Electricians Forums, not confirmed guidance - but if you're experiencing this, check your specific scheme grade requirements with your assessor.


Summary and Key Takeaways

What's changing:

  • From 1 October 2026, every individual carrying out EICRs under a Competent Person Scheme must hold a Level 3 Award in inspection and testing (2391-51, 2391-52, or equivalent), have 2 years of documented experience, and show ongoing CPD evidence
  • The firm-level competence model ends - one Qualified Supervisor can no longer cover unqualified operatives
  • BS 7671 Amendment 4 takes effect on 15 October 2026, bringing a new EICR form layout and updated standards

Why it's happening: The EAS update traces to Dame Judith Hackitt's review of the Grenfell Tower fire and the need for consistent, verifiable competence across the built environment.

What electricians should do:

  • Check your qualifications against the NICEIC or NAPIT accepted lists
  • Book the 2391 course now if you need it - training bottlenecks are expected
  • Gather 2 years of EICR evidence and start a CPD log
  • Audit every employed person under your certification
  • Get the BS 7671 Amendment 4 (Orange Book) and learn the form changes

What landlords should do:

  • Check your EICR expiry dates now and book renewals early
  • Verify your electrician holds 2391 or equivalent, not just a core trade qualification
  • Budget for higher costs and longer lead times
  • Document all tenant access attempts
  • Read the gov.uk guidance and NRLA guidance

Primary sources:

  • IET - Electrotechnical Assessment Specification
  • NICEIC - EAS changes: what you need to know
  • NAPIT - Changes to EAS Qualifications Guide

Check your qualifications are EAS-compliant before October 2026. TestFast helps you manage EICRs, track qualifications, and stay compliant through the transition.

Published 2 July 2026

Share this article:

Ready to transform your EICR workflow?

Join hundreds of UK electricians who are saving hours on every report with TestFast.

Get StartedMore Articles
TestFast LogoTestFast

Product

  • Home
  • Features
  • Pricing
  • How It Works
  • FAQ

Free Tools

  • All Free Tools
  • 2391-52 Mock Exam
  • Max Zs Calculator
  • Voltage Drop & Cable Size Calculator
  • Observation Builder
  • Max Demand Calculator
  • R1+R2 & Ring Continuity Calculator
  • PFC Calculator

Legal

  • Privacy Policy
  • Terms of Service
  • Sitemap
Try TestFast Now

Software

  • EICR Software
  • Electrical Certificate Software
  • Electrical Testing Software
  • Electrical Contractor Software
  • EICR Certificate Software
  • Best EICR Software
  • Free EICR Software
  • Electrical Certificate App
  • Electrical Certificate Software Pricing

Resources

  • Blog
  • Press
  • Partners
  • Testimonials
  • About Us
ICO registered with the Information Commissioner's Office

© 2026 TestFast. All rights reserved.

TestFast LogoTestFast

Work you'd sign - EICR Software for electricians who refuse to compromise.

Built in Scotland

ICO registered with the Information Commissioner's Office

Product

  • Home
  • Features
  • Pricing
  • How It Works
  • FAQ

Software

  • EICR Software
  • Electrical Certificate Software
  • Electrical Testing Software
  • Electrical Contractor Software
  • EICR Certificate Software
  • Best EICR Software
  • Free EICR Software
  • Electrical Certificate App
  • Electrical Certificate Software Pricing

Free Tools

  • All Free Tools
  • 2391-52 Mock Exam
  • Max Zs Calculator
  • Voltage Drop & Cable Size Calculator
  • Observation Builder
  • Max Demand Calculator
  • R1+R2 & Ring Continuity Calculator
  • PFC Calculator

Resources

  • Blog
  • Press
  • Partners
  • Testimonials
  • About Us

Legal

  • Privacy Policy
  • Terms of Service
  • Sitemap
Try TestFast Now

© 2026 TestFast. All rights reserved.